New Gaming PC

Lavajackal

New member
Hi Guys,

Old PC is finally starting to show it's age and am looking for an upgrade. My budget is around £1700 and this is the build I am currently considering any thoughts?

Case
COOLERMASTER MASTERBOX 5t GAMING CASE
Processor (CPU)
Intel® Core™ i5 Six Core Processor i5-8600K (3.6 GHz) 9 MB Cache
Motherboard
Gigabyte Z370 AORUS Ultra Gaming: ATX, LG1151, USB 3.1, SATA 6GBs - RGB Ready
Memory (RAM)
16GB Corsair VENGEANCE DDR4 2666MHz (2 x 8GB)
Graphics Card
8GB NVIDIA GEFORCE GTX 1080 - DVI, HDMI, 3x DP - GeForce GTX VR Ready!
1st Hard Disk
1TB Samsung 860 EVO 2.5" SSD, SATA 6Gb/s (upto 550MB/sR | 520MB/sW)
DVD/BLU-RAY Drive
NOT REQUIRED
Power Supply
CORSAIR 550W TXm SERIES™ SEMI-MODULAR 80 PLUS® GOLD, ULTRA QUIET
Power Cable
1 x 1 Metre UK Power Cable (Kettle Lead)
Processor Cooling
CoolerMaster Hyper 212X (120mm) Fan CPU Cooler
Thermal Paste
STANDARD THERMAL PASTE FOR SUFFICIENT COOLING
Sound Card
ONBOARD 6 CHANNEL (5.1) HIGH DEF AUDIO (AS STANDARD)
Wireless/Wired Networking
WIRELESS 802.11 AC1300 867Mbps/5GHz, 400Mbps/2.4GHz PCI-E CARD
USB Options
MIN. 2 x USB 3.0 & 2 x USB 2.0 PORTS @ BACK PANEL + MIN. 2 FRONT PORTS
Operating System
Genuine Windows 10 Home 64 Bit - inc. Single Licence
Operating System Language
United Kingdom - English Language
Windows Recovery Media
Windows 10 Multi-Language Recovery Image - Unlimited Downloads from Online Account
Office Software
FREE 30 Day Trial of Microsoft® Office® 365 (Operating System Required)
Anti-Virus
NO ANTI-VIRUS SOFTWARE
Browser
Google Chrome™
Warranty
3 Year Standard Warranty (1 Month Collect & Return, 1 Year Parts, 3 Year Labour)
Delivery
STANDARD INSURED DELIVERY TO UK MAINLAND (MON-FRI)
Build Time
Standard Build - Approximately 12 to 14 working days
Quantity
1

Price £1,640.00 including VAT and delivery
 

SpyderTracks

We love you Ukraine
If you’re ok to hold on a bit, Nvidia are about to release their next gen cards in about 10 days time and they’re set to be more powerful for less cash.
 

Oussebon

Multiverse Poster
As above, it would make a lot of sense to hold fire. The announcement is expected to be 20th Aug so in 5 days now. Crazy to buy a 1080 at this point.
 
Top