Estimated wait time from experience

VikCha

Member
Hi all, I wonder if anybody has experience of buying a liquid build PC with an RTX 3090 and what the wait time was from ordering to delivery.

I ordered this on 13th April, and I know there is a wait, was just wondering as I may need to borrow a laptop if the wait is going to be significant!

Many thanks:

Vik
 

SpyderTracks

We love you Ukraine
Hi all, I wonder if anybody has experience of buying a liquid build PC with an RTX 3090 and what the wait time was from ordering to delivery.

I ordered this on 13th April, and I know there is a wait, was just wondering as I may need to borrow a laptop if the wait is going to be significant!

Many thanks:

Vik
We've only had a couple of liquid series recently, but I've found a couple of mentions below:

https://www.pcspecialist.co.uk/foru...times-were-too-much-for-you.81237/post-604384 - Roughly 42 days when switched to the Strix 3090 (as normal 3090 at that time was poor stocks)

https://www.pcspecialist.co.uk/foru...times-were-too-much-for-you.81237/post-605097 - Roughly 3 weeks (15 days)
 

VikCha

Member
Thanks for the replies everybody. I think I’m on day 47 with a non-strix 3090.

I hope it’s not too much longer!

What case and cooling options have you gone for @loso64
 

loso64

Well-known member
Thanks for the replies everybody. I think I’m on day 47 with a non-strix 3090.

I hope it’s not too much longer!

What case and cooling options have you gone for @loso64
i have gone for Liquid Series Lian Li O11 Dynamic XL Silver. so custom watercooling loop for both CPU and GPU.
I have also changed to 3080TI Strix to save a bit of money, so far 43 working days.

I have been told my parts are ready for 4 weeks now. it is just workforce. I guess liquid builds not only take longer time to make, but require a specific specialists skills. So this computers are built less frequent than normal ones.

Last time i talked to Tove on monday, she said that she believes i could be entering build by the end of this week. But considering it is thursday and still nothing, I think it will happen next week. Shame tho, i get it, PCS is overbooked with all the orders, but to wait month and half (6 weeks) to enter building despite all parts being ready, it sucks
 

loso64

Well-known member
oh on a side note, my parts were ready for this long, because i have switched to 3090 Strix back when it was grey, well knowing there is no date for delivery on that one. So i was probably the first one to get stock assigned, hence the fact all the parts were ready for 4-5 weeks now
 
Top