Just ordered

Just ordered this in 2nd working day of previous production how long do you think I will have to wait
Chassis & Display
Octane Series: 15.6" Matte Full HD IPS LED Widescreen (1920x1080)
Processor (CPU)
Intel® Core™i7 Quad Core Processor i7-4790k (4.0GHz) 8MB Cache
Memory (RAM)
32GB KINGSTON HYPER-X IMPACT 1600MHz SODIMM DDR3 (4 x 8GB)
Graphics Card
NVIDIA® GeForce® GTX 970M - 6.0GB DDR5 Video RAM - DirectX® 12
1st Hard Disk
480GB KINGSTON HYPERX SAVAGE SSD, SATA 6 Gb/s (upto 560MB/sR | 530MB/sW)
External DVD/BLU-RAY Drive
8x Samsung Slim USB 2.0 External DVD-RW
Memory Card Reader
Integrated 6 in 1 Card Reader (SD /Mini SD/ SDHC / SDXC / MMC / RSMMC)
Thermal Paste
STANDARD THERMAL PASTE FOR SUFFICIENT COOLING
Sound Card
Intel 2 Channel High Definition Audio + MIC/Headphone Jack
Wireless/Wired Networking
GIGABIT LAN & WIRELESS INTEL® AC-7265 M.2 (867Mbps, 802.11AC) + BLUETOOTH
USB Options
4 x USB 3.0 PORTS (1 x POWERED) + 1 e-SATA/USB 3.0 PORT COMBINED
Battery
Octane Series 8 Cell Lithium Ion Battery (82WH)
Power Cable
1 x UK Power Lead & 230W AC Adaptor
Keyboard Language
OCTANE SERIES BACKLIT UK KEYBOARD WITH NUMBER PAD
Operating System
Genuine Windows 10 Home 64 Bit - inc DVD & Licence
Windows 10 Upgrade
FREE Upgrade to Windows 10 with all Windows 7 & Windows 8.1 Purchases*
DVD Recovery Media
Windows 10 (64-bit) DVD with paper sleeve
Office Software
NO OFFICE SOFTWARE
Anti-Virus
NO ANTI-VIRUS SOFTWARE
Browser
Google Chrome™
Mouse
INTEGRATED 2 BUTTON TOUCHPAD MOUSE
Webcam
INTEGRATED 2.0 MP FULL HD WEBCAM
Warranty
3 Year Silver Warranty (1 Year Collect & Return, 1 Year Parts, 3 Year Labour)
Dead Pixel Guarantee
30 Day Dead Pixel Guarantee Inc. Labour & Carriage Costs
Delivery
STANDARD INSURED DELIVERY TO UK MAINLAND (MON-FRI)
Build Time
Standard Build - Approximately 7 to 9 working days
Promotional Item
FREE METAL GEAR SOLID game with select GTX 9 Series GPUs! -Subject to T&Cs
Quantity
1
 

SpyderTracks

We love you Ukraine
I would make a quick amend to the order and get the upgraded thermal paste. With that chip in a laptop you're going to want any help possible to reduce temps.

No one can guess how long lead times will be, it all depends how quickly they're able to clear any backlogs with the skylake scenario, and that parts are all available.
 

Stephen M

Author Level
My Octane was 13 working days but that was just before the Skylake thing. Spyder is right about upgrading the paste, that CPU runs hot. If you have a cooling pad it would help as well.
 
Top