pre production

My pc status went into pre production on the 5th January, does anyone have an estimated guess on when it could be moved onto the building process?
 

Bhuna50

Author Level
It really depends on what you have ordered and if everything is in stock or not. Post your spec here and someone might be able to give you an idea
 
Case CIT PYRO RGB MID TOWER CASE
Processor (CPU)Intel® Core™ i7 Eight Core Processor i7-9700K (3.6GHz) 12MB Cache
MotherboardGigabyte Z390 UD: ATX, LG1151, USB 3.1, SATA 6GBs - RGB Ready
Memory (RAM)16GB Corsair VENGEANCE DDR4 2400MHz (2 x 8GB)
Graphics Card6GB NVIDIA GEFORCE RTX 2060 - HDMI, DP - VR Ready!
down_right_arrow.gif
Change to: 6GB AMD RADEON™ RX 5600 XT - HDMI, DP, DX® 12
1st Storage Drive250GB SEAGATE BARRACUDA 120 2.5" SSD, (up to 560MB/sR | 540MB/sW)
2nd Storage Drive2TB SEAGATE BARRACUDA SATA-III 3.5" HDD, 6GB/s, 7200RPM, 256MB CACHE
 

Bhuna50

Author Level
Can I suggest you post your full spec as per this post as my guess is there will be a few recommended changes here.

Faster RAM, consider M2 drives, AMD instead of Intel?

How to Post Your Specification to the Forum - Check this Spec | PCSPECIALIST

AMD Vs Intel | PCSPECIALIST

Doesnt look like any of what your have selected is pre-order or out of stock (per configurator) anyway so hopefully it wont be long for you - what was the estimated time build on your order?

Only way to tell for definite is to give them a call, but before it gets into build - get some advice on your full spec in case any other changes to be considered..
 

PhilGP

Silver Level Poster
My experience - Nov/Dec, so during the pre-xmas rush.
I had no unusual components in my orders.

Desktop:
Pre-Production - 11 working days
Dispatched - 4 working days later
Laptop:
Pre-Production - 7 working days
Dispatched - 2 working days later
 
Top